Question: A company manufactures product Z using four basic components and performing two additional machining and three assembly operations. Components A and C are made by

  1. A company manufactures product Z using four basic components and performing two additional machining and three assembly operations. Components A and C are made by the company, and components B and D are purchased from vendors (The BOM for product Z is given in the figure 9a and 9b below). The product is made as follows:

    1. A unit of component A is machined and converted into component E.

    2. A unit of E is then assembled with two units of B to make F.

    3. A unit of C is machined and converted into G.

    4. A unit of A and three units of D are assembled into H.

    5. One unit of F, two units of G, two units of H, and four units of B are then assembled into product Z.

    1. a) Construct a product structure tree for product Z.

    2. b) Construct a production time chart for product Z.

c)

Derive the material requirements plans for product Z and components F and E using lot-for-lot procurement, assuming the requirements for product Z (from the master production schedule) are as follows:

week 1 2 3 4 5 6 7 8 9 10
requirement 0 0 0 0 0 0 200 0 0 300

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!