Question: A completely mixed reactor (V = 1000 m) is receiving 15,000 L/min wastewater stream with a pollutant concentration of 100 kg/m? There is another 5

A completely mixed reactor (V = 1000 m) is receiving 15,000 L/min wastewater stream with a pollutant concentration of 100 kg/m? There is another 5 m/min influent from an adjacent factory that has 0.5 kg/ mpollutant. 75% of pollutants are biologically removed in the reactor. To prevent overloading the operator decided to bypass 5% of wastewater flow and have it mixed with effluent (Q3 and 3). Calculate Q3 in GPS and Cg in lb/ft? ("No unit) Q3 - GPS: C3- Ib/ft? 0.05. Q.. Lagoon 73 pollutant removal Blank 3 "align="bottom" border="0">
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
