Question: a) Compute the predetermined overhead rate using traditional costing with machine hours as the basis. (b) What is the manufacturing cost per stairway under traditional

 a) Compute the predetermined overhead rate using traditional costing with machinehours as the basis. (b) What is the manufacturing cost per stairwayunder traditional costing? (c) What is the manufacturing cost per stairway under

a) Compute the predetermined overhead rate using traditional costing with machine hours as the basis.

(b) What is the manufacturing cost per stairway under traditional costing?

(c) What is the manufacturing cost per stairway under the proposed activity-based costing?(Prepare all of the necessary schedules.)

(d) Which of the two costing systems is preferable in pricing decisions and why?

Concord Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2020 are as follows. For the last 4 years, Concord Co. has been charging overhead to products on the basis of machine hours. For the year 2020,100,000 machine hours are budgeted. Jeremy Nolan, owner-manager of Concord Co., recently directed his accountant, Bill Seagren, to implement the activity-based costing system that he has repeatedly proposed. At Jeremy Nolan's request, Bill and the production foreman identify the following cost drivers and their usage for the previously budgeted overhead cost pools. Steve Hannon, sales manager, has received an order for 250 stairways from Community Builders, Inc., a large housing development contractor. At Steve's request, Bill prepares cost estimates for producing components for 250 stairways so Steve can submit a contract orice per stairway to Community Builders. He accumulates the following data for the production of 250 stairways. Direct materials $104,000 Direct labor $112,800 Machine hours Direct labor hours Number of purchase orders Number of material moves Number of machine set Number of inspections Number of components 16,000 Number of square feet occupied

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!