Question: ( a ) Construct the project network. ( Submit a file with a maximum size of 1 MB . ) Choose File No file chosen

(a) Construct the project network. (Submit a file with a maximum size of 1 MB .) Choose File No file chosen
This answer has not been graded yet.
(b) Based solely on the critical path, estimate the probability that the project will be complete within 11 weeks. (Round your answer to four decimal places.)
(c) Using all paths through the project network, estimate the probability that the project will be complete within 11 weeks. (Round your answer to four decimal places.)
1
(d) Should you use the estimate in (b) or (c)?
The probability estimate from (b) based on the critical path is more accurate.
The probability estimate from (c) based on both paths is more accurate.
The probability estimates from (b) and (c) are equal.
(a) Draw a project network. (Submit a file with a maximum size of 1 MB .) Choose File No file chosen
This answer has not been graded yet
(b) Identify the critical path. (Enter your answers as a comma-separated list.)
(c) Develop the activity schedule for the project.
The expected completion time is weeks, which is ---Select--\(\vee \) than 1 year Estimates of the optimistic, most probable, and pessimistic times (in weeks) for the activities are as follows.
(a) Find the critical path. (Enter your answers as a comma-separated list.)
(b) What is the expected project completion time (in weeks)?
(c) Based only on the critical path, what is the estimated probability the project can be completed in 43 weeks as requested by the owner? (Round your answer to four decimal places.)
(d) Based only on the critical path, what is the estimated probability the building project could run more than 3 months late? Use 56 weeks for this calculation. (Round your answer to four decimal places.)
(e) What should the construction company tell the owner? (Enter your free-form answer using as many characters as necessary.)
 (a) Construct the project network. (Submit a file with a maximum

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!