Question: ( a ) Construct the project network. ( Submit a file with a maximum size of 1 MB . ) Choose File No file chosen

(a) Construct the project network. (Submit a file with a maximum size of 1 MB .) Choose File No file chosen
This answer has not been graded yet.
(b) Based solely on the critical path, estimate the probability that the project will be complete within 11 weeks. (Round your answer to four decimal places.)
[\( x \)
(c) Using all paths through the project network, estimate the probability that the project will be complete within 11 weeks. (Round your answer to four decimal places.)
\(.8230\quad x \)
(d) Should you use the estimate in (b) or (c)?
The probability estimate from (b) based on the critical path is more accurate.
The probability estimate from (c) based on both paths is more accurate.
The probability estimates from (b) and (c) are equal.
 (a) Construct the project network. (Submit a file with a maximum

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock