Question: A construction project requires 8 , 0 0 0 m 3 of aggregate. The aggregate must contain no less than 4 0 % sand and

A construction project requires 8,000 m3 of aggregate. The aggregate must contain no less than 40% sand and no more than 55% gravel. Materials may be obtained from two sites. Material from each site has a different mixture of sand and gravel, and comes at a different delivery cost. These are described below.
Delivery Cost
Site ($/m3)% Sand % Gravel 153565
276040
The objective is to find the least-cost mixture of material from the two sites.
a) Formulate the problem as a linear program, with a linear objective function and linear constraints. Identify the decision variables. Explain each constraint.
b) Graph the feasible region and solve the problem graphically.
c) Solve the problem using Excel.
d) Briefly interpret the results, and explain the meaning of each Lagrange multiplier.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!