Question: A construction project requires the fill from a borrow site in which the soil has the following the characteristics:Void ratio: 0 . 6 5 Specific

A construction project requires the fill from a borrow site in which the soil has the following the characteristics:Void ratio: 0.65Specific gravity: 2.69Moisture content: 17%The required fill needs to be compacted to a dry unit weight of 108 pcf to construct a 100,000 yd3 fill embankment.What is the minimum volume of soil required in yd3 to bring from the borrow site?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!