Question: A consulting engineering firm is preparing a preliminary cost estimate for a 4 0 - MW advanced combined cycle natural gas - fired power plant.
A consulting engineering firm is preparing a preliminary cost estimate for a MW advanced combined cycle natural gasfired power plant. The firm, which completed a similar project in with a total cost construction and equipment of $ million, wants to use a construction cost index to update the construction cost. If the construction cost was assumed to be of the total cost and the index value in was estimate the cost of construction for a similarsize plant in when the index is Round the final answer to the nearest whole number.
The cost of construction in year is determined to be $ million.