Question: A contractor has been required to place 3 0 , 0 0 0 yd 3 of fill. The results of a proctor compaction test on
A contractor has been required to place yd of fill. The results of a proctor compaction
test on the borrow material reveal pcf and a At the borrow pit, the
soil has an average pcf and a If the specifications require of and
at find how much soil is required to place the fill material ft If the dump trucks
transporting it can carry tons, how many total trips will be required? How much water ft will
be need to be added or subtracted from the fill? yd ft and ton lb