Question: A contractor is planning to use a crawler loader with a 3 CY bucket to excavate the side of a hill for construction of a
A contractor is planning to use a crawler loader with a CY bucket to excavate the side of a hill for construction of a new road. The material is a mixed granular type weighing lbLCY with a swell of and a shrinkage of The material will be stockpiled an average of feet away and the machine travels at an average speed of mph The static tipping load is lbs and the operational factor is The average hourly operating cost minus labor is $hr the average hourly ownership cost is $ hr and the labor cost is $ per hour plus fringe benefits. The site requires BCY to be moved.
What is the total time required to perform the excavation in hours?