Question: A Contractor is using a wheeled loader with the bucket size of 3 . 5 C Y to carry the moist loam. The density of
A Contractor is using a wheeled loader with the bucket size of to carry the moist loam. The density of moist loam is and the fill factor is The static tipping load of the loader is The fixed travel time is min. The average speed for hauling and return is and respectively. The travel distance is The operation efficiency is hour. The contractor estimates hourly cost for the wheeled loader is as follows: the ownership cost is $ hour, the operating cost is $our, and the operator wage is $ hour.
A What is the maximum capacity per cycle?
B What is the loader's productivity?
C What is the estimated unit cost in of the loader to work on the job?