Question: A Contractor is using a wheeled loader with the bucket size of 3 . 5 C Y to carry the moist loam. The density of

A Contractor is using a wheeled loader with the bucket size of 3.5CY to carry the moist loam. The density of moist loam is 2,350lbLCY, and the fill factor is 1.1. The static tipping load of the loader is 22,000lb. The fixed travel time is 0.8min. The average speed for hauling and return is 4mph and 7mph, respectively. The travel distance is 500ft. The operation efficiency is 50min? hour. The contractor estimates hourly cost for the wheeled loader is as follows: the ownership cost is $28? hour, the operating cost is $32hour, and the operator wage is $47? hour.
A. What is the maximum capacity per cycle?
B. What is the loader's productivity?
C. What is the estimated unit cost in $LCY of the loader to work on the job?
A Contractor is using a wheeled loader with the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!