Question: A contractor needs to place 1 0 , 0 0 0 yd 3 of fill. The results of a Proctor test on the borrow material
A contractor needs to place yd of fill. The results of a Proctor test on the
borrow material reveal gamma dmax pcf and wopt At the borrow pit, the soil has an average gamma T pcf and w She is using ton dump trucks. The compaction specification is set at of standard proctor with wopt pm
Determine:
The truck trips from borrow pit to fill required to place the fill?
The minimum amount of water in ft that of water must be added or subtracted
dried from the fill?