Question: A copy machine is available 24 hours a day. On a typical day, the machine produces 87 jobs. Each job takes about 4 minutes on

 A copy machine is available 24 hours a day. On atypical day, the machine produces 87 jobs. Each job takes about 4

A copy machine is available 24 hours a day. On a typical day, the machine produces 87 jobs. Each job takes about 4 minutes on the machine, 3 minutes of which is processing time and 1 minute is setup time (logging in, defining the job). About 18 Percent of the jobs need to be reworked, in which case the setup time and the processing time have to be repeated. The remainder of the time, the equipment is idle. What is the OEE of the equipment? (Round your percentage answer to 1 decimal place.) What is the OEE of the equipment? percent In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 16.45 hours. The time in the welding operation is spent as follows: 2 hours waiting in front of the cutting machine for the batch to start, 3 hours waiting for the setup of the machine, 2 hour waiting for the other pieces of the batch to go through cutting, 2 minute at the cutting machine, and 4 hours waiting for the transfer to the welding machine. Then, at the welding machine, the unit spends 2 hour waiting in front of the welding machine for the batch to start, 1 hour waiting for the setup of the welding machine, 0.45 hour waiting for the other pieces of the batch to go through welding, 0.55 minute at the welding machine, and 2 hour waiting for the transfer to the next department. (Round your percentage answer to 4 decimal places.) Determine the exact flow time. What is the value-added percentage of the flow time? percent

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!