Question: A crest vertical curve connects a + 0 . 9 7 % grade and a - 5 . 1 5 % grade. The PVI is

A crest vertical curve connects a +0.97% grade and a -5.15% grade. The PVI is at station 45+90.00 at an elevation of 612.00ft. The design speed is 45mih.
Determine the minimum length of the vertical curve using the AASHTO rate of vertical curvature concept ("K" factors), and then round the minimum length up to the next 10ft multiple for design of the vertical curve and associated calculations. Using this length, determine:
The station and elevation of the PVC
The station and elevation of the PVT
The station and elevation of the high point
The elevation of station 47+00.00
A crest vertical curve connects a + 0 . 9 7 %

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!