Question: A design team was charged with a Cpk = 1.3 and Nominal Peak Pulse Current of 10A. They measured 30 parts from one of the
A design team was charged with a Cpk = 1.3 and Nominal Peak Pulse Current of 10μA. They measured 30 parts from one of the vendors and found the average to be 10μA, with a standard deviation of 0.2. What should the part specification be set to?
- Specification = 10μA +/- ________________
Step by Step Solution
3.46 Rating (149 Votes )
There are 3 Steps involved in it
Process capacity index is nothing but the statistical measure of pro... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (2 attachments)
635dcfef26eed_179073.pdf
180 KBs PDF File
635dcfef26eed_179073.docx
120 KBs Word File
