Question: a. Develop a network for this assembly operation 42. The assembly of a transistorized clock radio requires a total of 11 tasks. The task times

a. Develop a network for this assembly operation 42. The assembly of a transistorized clock radio requires a total of 11 tasks. The task times and predecessor relationships are given in the following table. Immediate Task Time (seconds) Predecessors 1 2 3 4 1.2 2 4 6 7 8 9 10 11 SONO NON 60 7 8,9 3,10 C