Question: A developer ( client ) has recently bought Erf 5 6 3 8 , Lephalale Extension 7 0 . He / She has appointed you
A developer client has recently bought Erf Lephalale Extension He She has
appointed you as the Surveyor to carry out the survey on the said portion of land. He She
plans to build a triple storey building with a basement and floor coverage of about and a
parking bay of about One of the specifications is that the basement should be supported
with pillars that are at least m apart. Facility manager has done a projected life cycle costs
analysis on the proposed plan and the building is expected to last for at least years. The
area has a fully functional municipal bulk services and you have been requested to take those
into consideration. The client is not so concerned about height Z; however, heshe is more
concerned about the Y X coordinates and they should be within the grid. You can always
determine your own elevation Z The reason why the client is concerned about Y X is that
the proposed structures should be within the building line which is m and to avoid factors
pertaining encroachment. The survey was done on the th of August TrigNet was down
on that day and you could not connect to the system. Luckily, you managed to identify two
boundary beacons as indicated on Annexure A and you have decided to use them as your
control points. You decide to visit the site on a different day to verify the beacons using a
GNSSTotal station and calculated data coordinates Use your precise survey skills to
address the following:
Calculations beacons and settingout coordinates Raw data
Identification of instruments to carry out the survey
Plan of a detailed survey site survey
Establishment of control points BM and deformation controls
Positioning of the structure and parking bay coordinates
Trigonometric heighting if necessary
Aerial imagery as background source it at CD: NGI
D model for scanner outlined steps and procedures
Beacon coordinates, settingout coordinates, control points BMDeformation should
be on excel and pdf
Technical report
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
