Question: A drainage pipe beneath a dam has become clogged with sand whose coefficient of permeability is 1 0 m / day . It has been

A drainage pipe beneath a dam has become clogged with sand whose coefficient of permeability is
10m/day. It has been observed that the flow through the pipe is 0.15 m3
/day when the difference of
water levels on upstream and downstream is 20 m. If the cross-sectional area of the pipe was
200 cm2
, what length of the pipe was filled with sand?