Question: (a) Draw the network described in the table. (b) Without regard to a production schedule, what is the minimum possible cycle time (in seconds) for

(a) Draw the network described in the table. (b)

(a) Draw the network described in the table. (b) Without regard to a production schedule, what is the minimum possible cycle time (in seconds) for this situation; what is the maximum? (c) What is the required cycle time (in seconds) in order to meet the schedule? (d) What is the minimum number of workstations needed to meet the schedule? (e) Balance this line using longest processing time. f) What is the efficiency of the balance obtained in part e? [8 Marks]