Question: A firm wants to develop a level material use schedule based on the following data. What should be the setup cost? Desired lot size: Annual

A firm wants to develop a level material use
A firm wants to develop a level material use schedule based on the following data. What should be the setup cost? Desired lot size: Annual demand: Holding cost: Daily production rate: Work days per year. 40,000 $20 per unit per year 320 250 O A. $500 OB. $45 O c. $4.50 O D. $450 O E. $0.45 Click to select your