Question: A flow chart should prioritize the most important items. Center: 1 . Identify the need for an increase in operation room and CT scan capacity
A flow chart should prioritize the most important items.
Center:
Identify the need for an increase in operation room and CT scan capacity
Conduct a feasibility study to determine if expansion is viable
Develop a budget for building or renovating existing space
Design layout of new or renovated center with increased operating and scanning rooms
Acquire necessary equipment and technology
Hire additional staff members as needed
Create procedures for patient flow, scheduling, billing
insurance management
Implement quality assurance measures to ensure safety standards are met
Market services offered at Health Center
Evaluate effectiveness of operations over time
Information System
HIS
Review the existing system.
Define the data needs of relevant units within the health system.
Determine the most appropriate and effective data flow.
Design the data collection and reporting tools.
Develop the procedures and mechanisms for data processing.
Steps in developing a Health
Information System
HIS
Develop and implement a training programme for data providers and data users.
Pre
test, and if necessary, redesign the system for data collection, data flow, data processing and data utilization.
Monitor and evaluate the system.
Develop effective data dissemination and feedback mechanisms.
Enhance the HIS
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
