Question: A flow line has to process 5 completed items per hour during an 8 - hour working shift. Each item requires ten ( 1 0

A flow line has to process 5 completed items per hour during an 8-hour working shift. Each item requires ten (10) work elements as shown in the table below:EPT2602(3)ElementElement duration (minutes)Immediate predecessor/s6NoneBNoneA, BD10E4B, DFDGA, E, F64G8H,T1.2.1 Calculate the rank positional weight of each work element.1.2.2 Use the rank positional weight method and assign the elements to workstations. Show full calculations including the cycle time, cumulative station times, and the unassigned station times in a table.