Question: A freeway is being designed for a location in rolling terrain. The expected FFS is 5 5 mi / h . During the peak hour,

A freeway is being designed for a location in rolling terrain. The expected FFS is 55 mi/h. During the peak hour, it is expected that there will be a that is of a mile long. With the peak-hour factor unchanged, how many trucks (assuming the same ST/TT split) can be added to the peak hour before capacity is reached?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!