Question: A freeway is being designed for a location in rolling terrain. The expected FFS is 5 5 mi / h . During the peak hour,
A freeway is being designed for a location in rolling terrain. The expected FFS is mih During the peak hour, it is expected that there will be a that is of a mile long. With the peakhour factor unchanged, how many trucks assuming the same STTT split can be added to the peak hour before capacity is reached?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock