Question: A freeway segment is to be redesigned between point A and point C as the original design doesn't provide the desired LOS. The 4 .

A freeway segment is to be redesigned between point A and point C as the original design doesn't provide the desired LOS. The 4.6 miles stretch of freeway has the interchange spacing and traffic volumes predefined from existing counts. Assume no ramp to ramp flow for any potential weaving sections. You may assume a freeway free flow speed of 70 mph and all ramp free flow speeds of 50 mph . The design requirement is a LOS C for the existing traffic condition. You are to develop a lane plan for the freeway and indicate the length of acceleration lanes and length of deceleration lanes on the lane plan. You are not to over design the facility - spend our tax dollars wisely. The project is
A freeway segment is to be redesigned between

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!