Question: A grid - method leveling survey was conducted on a 4 0 0 f t 4 0 0 f t grid with the label scheme

A grid-method leveling survey was conducted on a 400ft400ft grid with the label scheme shown below. Rod readings were taken at 100 ft intervals and the raw field note data are included below. Complete the field book information to determine elevations at each point. Sketch the 1-ft contour lines on an appropriate grid.
Field Note Data
\table[[Station,BS,HI FS/Rod E,Elev],[BM1,6.7,,64.5],[A1,,5.6,],[A2,,6.8,],[A3,,6.7,],[A4,,8.3,],[A5,,9,],[B1,,6,],[B2,,7.8,],[B3,,8.7,],[B4,,9.7,],[B5,,9.5,],[C1,,10.2,],[C2,,7.4,],[C3,,7,],[C4,,6.1,],[C5,,7.8,],[D1,,5.7,],[D2,,6.6,],[D3,,6.1,],[D4,,3.1,],[D5,,2.9,],[E1,,3.2,],[E2,,5.9,],[E2,,4.9,],[E4,,4,],[E4,,2.7,],[E5,,,],[,,1.7,]]
A grid - method leveling survey was conducted on

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!