Question: A horizontal flow clarifier is to be implemented after a coagulation flocculation treatment process, which follows type 2 settling. A lab has been able to
A horizontal flow clarifier is to be implemented after a coagulation flocculation treatment
process, which follows type settling. A lab has been able to produce the following
figure relating the turbidity at cm to settling time. Use this figure to answer the
following questions.
The turbidity is related to the amount of solids present. What is the turbidity that
should be targeted in order to achieve a removal of solids?
b What is the loading rate of the sedimentation required to achieve this removal?
c For a water demand rate of msec size the required sedimentation basin based
such that the depth is m and the length is times larger than the width.
d What is the detention time of this system?a The turbidity is related to the amount of solids present. What is the turbidity that
should be targeted in order to achieve a removal of solids?
b What is the loading rate of the sedimentation required to achieve this removal?
c For a water demand rate of size the required sedimentation basin based
such that the depth is and the length is times larger than the width.
d What is the detention time of this system?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
