Question: A hydrological analysis was completed for a basin above a proposed roadway and culvert crossing on SR 5 3 0 . The analysis found that
A hydrological analysis was completed for a basin above a proposed roadway and culvert crossing on SR The analysis found that the year flow event was cfs and the year flow event was cfs In the vicinity of the round culvert, the preferable roadway profile would place the centerline at elevation feet, about feet higher than the existing channel bottom. The tailwater depth was found to be feet during the year flow event and feet during the year flow event. Also, there are no fish passage concerns at this location. Assume that the culvert will be ft long and will match the existing channel slope of mathrmftmathrmft Determine the culvert size, and calculate the controlling headwater elevation and corresponding outlet velocity for both the and year events.
Assumptions:
Culvert will be circular and concrete
Headwater to diameter ratio will be or for the year flow
Culvert end will be left projecting out of the fill since the culvert ends will be out of the clear zone
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock