Question: A. __ is the Bottleneck B. The bottleneck time is _ minutes per unit C. the longest path through the production process overall system is

A. __ is the Bottleneck
B. The bottleneck time is _ minutes per unit
C. the longest path through the production process overall system is _ minutes
D. if the firm operates 8 hours per day, 20 per month what is the monthly capacity of the manufacturing process?
production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are dependent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel)