Question: A . Is there a bottleneck ( constraint ) ? If so , which resource is a bottleneck ( constraint ) ? ( 5 points

A. Is there a bottleneck (constraint)? If so, which resource is a bottleneck (constraint)?(5
points)
B. Determine the product mix (type of cookie and how many boxes for each type) that
would maximize the profit. (5 points)
C. Calculate the profit. (2 points)
2. A process filling small bottles with baby formula has a target of 3 ounces {0.150 ounce.
Two hundred bottles from the process were sampled. The results showed the average
amount of formula placed in the bottles to be 3.042 ounces. The standard deviation of the
amounts was 0.034 ounce. Is this process capable? (1 point) Justify your answer with
process capability calculations? (3 points)
3. Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly
selects samples of bottles from the bottle machine and measures the outside diameter of
the bottle-cap, a critical quality dimension that determines whether the bottle cap will fit
properly. The mean diameter (in inches) of the sample obtained from the machines
production output is 0.592. The process standard deviation is 0.01. Suppose that the
specification for the bottle-cap diameter is 0.600\pm 0.050. What is the process capability
index for this process? (2 points) If the firm is seeking four-sigma performance, is the
process capable of producing the bottle? (2 points)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!