Question: A . Is there a bottleneck ( constraint ) ? If so , which resource is a bottleneck ( constraint ) ? ( 5 points
A Is there a bottleneck constraint If so which resource is a bottleneck constraint
points
B Determine the product mix type of cookie and how many boxes for each type that
would maximize the profit. points
C Calculate the profit. points
A process filling small bottles with baby formula has a target of ounces ounce.
Two hundred bottles from the process were sampled. The results showed the average
amount of formula placed in the bottles to be ounces. The standard deviation of the
amounts was ounce. Is this process capable? point Justify your answer with
process capability calculations? points
Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly
selects samples of bottles from the bottle machine and measures the outside diameter of
the bottlecap, a critical quality dimension that determines whether the bottle cap will fit
properly. The mean diameter in inches of the sample obtained from the machines
production output is The process standard deviation is Suppose that the
specification for the bottlecap diameter is pm What is the process capability
index for this process? points If the firm is seeking foursigma performance, is the
process capable of producing the bottle? points
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock