Question: A JIT / lean system uses kanban cards to authorize production and movement of materials. In one portion of the system, a work centre uses

A JIT/lean system uses kanban cards to authorize production and movement of materials. In one portion of the system, a work centre uses an average of 105 pieces of a part per hour. The manager has assigned cas safety factor of 0.50. Standard containers are designed to hold five dozen pieces each. The cycle time for a kanban is 117 minutes.
How many kanbans are needed? (Round the final answer to the nearest whole number.)
Number of Kanbans
 A JIT/lean system uses kanban cards to authorize production and movement

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!