A large warehouse project requires 30,000 cubic yards of excavation (cut) and 24,000
cubic yards of fill. The in situ soil density is 109 pcf, and the in situ water content is 14%.
The fill soil is to be compacted to 90% relative compaction, and its maximum dry density
is 126 pcf (assume the fill has a uniform dry density that is 90% of the maximum).
a. Determine how much excess cut/fill soil the project will generate. Report your
answer as a mass of solids.
b. When soil is placed in a dump truck for transportation it takes up 25% more
volume than it does in situ. If a dump truck can transport 20 cubic yards of soil
per trip, how many trips will be needed to remove all of the cut soil?
c. During transportation, the cut soil loses moisture such that it arrives at the fill area
with a moisture content of 10%. If the soil is to be compacted at a moisture
content of 16%, how much water will need to be added to the soil to compact the
entire fill area?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!