Question: A level was setup between BM A and TP1. The upper, middle, and lower cross hair readings on BM A was .718, .633, and
A level was setup between BM A and TP1. The upper, middle, and lower cross hair readings on BM A was .718, .633, and .550 meters. The upper, middle, and lower cross hair readings on TP1 was 1.131, 1.051, and .972 meters. The elevation of BM A was 103.8432 meters. Determine the elevation of TP 1. Hint: This is 3 Wire Leveling. It is often utilized when determining the elevation of TBMs for route construction projects since the method allows one to compute the distance from the level to the BS and FS(keeping them balanced), determine an average middle cross hair reading, and increases the precision of the answer. See page 115 of the text or do an internet search of 3-wire leveling. O 1) .6337 m 2) 104.4769 m 3) 104.4768 m 4) 1.0513 m 5) 103.4256 m 6) none 7) 103.2465 m
Step by Step Solution
3.45 Rating (161 Votes )
There are 3 Steps involved in it
The question is asking for the elevation of TP1 based on a surveying technique known as 3Wire Leveli... View full answer
Get step-by-step solutions from verified subject matter experts