Question: A limestone formation, with an average depth of 5 ft is exposed over the full 8 0 - ft width and 2 3 , 7

A limestone formation, with an average depth of 5 ft is exposed over the full 80-ft width and 23,700-ft length of a highway cut. Preliminary seismic investigations indicate that the rock layer has a seismic velocity of 5,500 fps. The contractor proposes to loosen this rock by using a single-shank ripper on a power shift, track-type tractor.
The job conditions relative to lamination and other rock characteristics are average, or midway between adverse and ideal. A 40-min hour working efficiency is possible. The contractor wishes to explore the use of two D10T2 Caterpillar dozers with single shank(for performance data see the CAT Handbook posted on Blackboard and check the assumptions).
O&O cost for these tractors is $126.00 per hour including rippers. However, dozers in ripping applications increase O&O cost 30-40%. The operator's wage & benefits is $74.30 per hour.
1. What is the project duration with two dozers (8 hour work days)? Round answer to nearest WHOLE days.
2. What is the cost/bcy to rip this rock?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!