Question: A linear programming computer package is needed. Greenville Cabinets received a contract to produce cabinets for a major furniture distributor. The contract calls for the
A linear programming computer package is needed.
Greenville Cabinets received a contract to produce cabinets for a major furniture distributor. The contract calls for the production of small cabinets and large over the next two months, with the following delivery schedule
Model Month Month
Small
Large
Greenville estimates that the production time for each small cabinet is hours and the production time for each large cabinet is hour. The raw material costs are $ for each small cabinet and $ for each large cabinet. Labor costs are $ per hour using regular production time and $ using overtime. Greenville has up to hours of regular production time available each month and up to additional hours of overtime available each month. If production for either cabinet exceeds demand in month the cabinets can be stored at a cost of $ per cabinet. For each product, determine the number of units that should be manufactured each month on regular time and on overtime to minimize total production and storage costs. Round your answers to the nearest integer. Let SaR regular small cabinets for month SbR regular small cabinets for month LaR regular large cabinets for month LbR regular large cabinets for month SaO overtime small cabinets for month SbO overtime small cabinets for month LaO overtime large cabinets for month and LbO overtime large cabinets for month
SaR SbR LaR, LbR SaO, SbO, LaO, LbO
Total Production Cost $
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
