Question: A linear programming computer package is needed. Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for
A linear programming computer package is needed.
Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of bookshelf speakers and floor
speakers over the next two months, with the following delivery schedule.
Greenville estimates that the production time for each bookshelf model is hours and the production time for each floor model is hour. The raw material costs are $ for each
bookshelf model and $ for each floor model. Labor costs are $ per hour using regular production time and $ using overtime. Greenville has up to hours of regular production
time available each month and up to additional hours of overtime available each month. If production for either cabinet exceeds demand in month the cabinets can be stored at
a cost of $ per cabinet. For each product, determine the number of units that should be manufactured each month on regular time and on overtime to minimize total production and
storage costs. Round your answers to the nearest integer. Let BaR regular bookshelf units for month regular bookshelf units for month FaR regular floor units for month
regular floor units for month BaO overtime bookshelf units for month BbO overtime bookshelf units for month FaO overtime floor units for month and FbO
overtime floor units for month
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock