Question: A loader at a batching plant has a loading rate of 12 truckloads per hour. The hauling operation is supported by a fleet of 3
A loader at a batching plant has a loading rate of 12 truckloads per hour. The hauling operation is supported by a fleet of 3 trucks with an arrival rate of 6 units per hour. The batch plant is installed a hopper with 3 truck load units of storage. The hopper loading rate is Draw a Markovian model for this construction operation and write the equation for the state Node that has 2 trucks and 2 units of storage in the system.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts