Question: a. Loading machine standard time=0.55 minute b. Unloading machine standard time=0.35 minute c. Walk-time between two machines= 0.10 minute d. Power-feed time (machine time) =1.60

a. Loading machine standard time=0.55 minute

b. Unloading machine standard time=0.35 minute

c. Walk-time between two machines= 0.10 minute

d. Power-feed time (machine time) =1.60 minute

e. Operator rate=18$/hr

f. Machine rate=15$/hr

Draw an operator machine chart for the optimal solution.