Question: A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 14 loans per day and

A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 14 loans per day and an effectlve capacity of 11 loans per day. (Round your answer to 1 declmal place.) . A furnace repalr team that services an average of 2 furnaces a day If the design capacity is 10 furnaces a day and the effectlve :apacity is 7 furnaces a day. (Round your answer to 1 decimal place.) Would you say that systems that have higher efficiency ratlos than other systems will always have higher utllizatlon ratios than those ther systems
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts