Question: A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 10 loans per day and
A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 10 loans per day and an effective capacity of 8 loans per day. Compute the efficiency measure in percentage ( 2 decimal points, e.g. 67.8% you write it as 67.80 Do not write the \% sign)