Question: A local power company is considering increasing its generating capacity to meet expected demand over the next 5 years. Currently, the company has a generating
A local power company is considering increasing its generating capacity to meet expected demand over the next 5 years. Currently, the company has a generating capacity of 600 MW. As per the demand forecast, the minimum generating capacities required over the next 5 years are as follows:

A)Formulate the problem and find optimal solution.
B) find EXCEL solution
Problem for Group A (formulate the problem and find optimal solution) A local power company is considering increasing its generating capacity to meet expected demand over the next 5 years. Currently, the company has a generating capacity of 600MW. As per the demand forecast, the minimum generating capacities required over the next 5 years are as follows: The company can increase its transmission capacity by purchasing five different types of generators: 20,50,80,100, and 120MW. The costs of acquiring, installing, and operating each of the five types of generators are summarized below: Any number of generators (of any type) can be added in any year. However, once a generator is added, it must be operated in the future years as required. Formulate a mathematical programming model to determine the least cost expansion plan, for 5 years, while fulfilling all yearly demandStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock