Question: A lump sum tender will be prepared base on the following information, 10m x 10m x 5m - Concept Design No geotechnical data, assume 80%

A lump sum tender will be prepared base on the following information, 10m x 10m x 5m - Concept Design No geotechnical data, assume 80% soil, 20% rock Productivity rate in soil: 20m3/d Productivity rate in rock: 10m3/d Excavator: $2000/d Labor: $500/d Overhead including profit: $200/d Additional assumptions can be made, if needed Explain and develop the Consequence Table for cost and time impacts

Explain and develop the Likelihood Table

Explain and develop the escalation table

Explain how these tools should be used effectively to identify, analyse and evaluate risks

Use the developed tools to assess top 10 risks A

ssess required time contingency

Assess required cost contingency

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!