Question: A machine tool produces 26 components for an assembled product. These are the only parts produced by the machine. To keep in-process inventories low, a

A machine tool produces 26 components for an
A machine tool produces 26 components for an assembled product. These are the only parts produced by the machine. To keep in-process inventories low, a batch size of 75 units is produced for each component. Demand for the product is 900 units/yr. Production downtime costs $120/hr. Changeover time between batches is 1.5 hr, and average cycle time per part = 4.0 min. The annual holding cost for each of the 26 parts is $1.60/pc. (a) Determine total annual inventory cost for the 26 parts. (b) Is the given production schedule feasible for a one- shift operation? That is, can 900 units of each of the 26 components be completed in 2000 hours? If so, how many idle hours of machine time occur in the 2000 hours? If not, how many overtime hours must be authorized during the year

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!