Question: A manager is contemplating using Rules 1 and 4 for determining out-of-control conditions. Suppose that the manager constructs 3 limits. (a) What is the overall
A manager is contemplating using Rules 1 and 4 for determining out-of-control conditions. Suppose that the manager constructs 3 limits. (a) What is the overall type I error probability assuming independence of the rules? (b) On average, how many samples will be analyzed before detecting a change in the process mean? Assume that the process mean is now at 110 mm (having moved from 105 mm) and that the process standard deviation is 6 mm. Samples of size 4 are selected from the process
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts