Question: A manager wishes to build a control chart for a process. A total of five (05) samples are collected with four (04) observations within each

A manager wishes to build a control chart for a
A manager wishes to build a control chart for a process. A total of five (05) samples are collected with four (04) observations within each sample. The sample means X-bar) are; 14.09, 13.94, 16,86, 18.77, and 16,64 respectively. Also, the corresponding ranges are: 9.90. 7.73, 2.89, 7.56, and 5.0 respectively. The lower and upper control limits of the x-bar chart are respectively Select one a. 11,44 20.66 nag b. None is correct 11.47, 16,55 d. 1123, 20:39 e 11.29. 20.65