Question: A manufacturing engineering section manager is examining the prototype assembly process sheet ( shown in Exhib company's newest subnotebook compuler model. Wth every new model

A manufacturing engineering section manager is examining the prototype assembly process sheet (shown in Exhib company's newest subnotebook compuler model. Wth every new model introduced. management feit that the asse increase productivity and lower costs, usualy resulting in changes to the assembly process. When a new moder is c considerabie attention is directed toward reducing the number of components and simplifying parts production and requitements. This new computer was a marvel of high-tech, low-cost hnowation and should give the company an ad the upcoming fali or winter seling season.
Production of the subnctebock is schedaled to begin in 10 days. Initial production for the new model is to be 150 units increasing to 240 units per day the followng week /managemans thought that eventually production would reach 300 Assembly lines at the plant normaly are slaffed by to aperators who wook of a 14.4-meter-bong assembly line. The Nine 1 straight ine with workers sthoulder to shoulder on one side. The line cen accommodate lp to 12 operators if there is on formaly operates for 75 hous a day fomplopees work from 815 A M. to 5:00 P.M. and regliter hours inciude one hour and ts minules of schediled breaks. It is possible to run one, two, or three hours of overtime, but employees need at lo, notice for planning purposes.
The Assembly Line
 A manufacturing engineering section manager is examining the prototype assembly process

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!