Question: A manufacturing site would like to determine optimal operating levels for their electric generators and associated distribution patterns that will satisfy the site user demand.
A manufacturing site would like to determine optimal operating levels for their electric generators and associated distribution patterns that will satisfy the site user demand. Consider the following proposed system.
Generators
Demand
Site
kWh
kWh
kWh
kWh
kWh
The distribution costs are:
Cost, $kWh
Site
Site
SUPPLY kWh
Generator
Generator
DEMAND kWh
Site
Formulate an LP problem and determine the optimal power distribution.