Question: A mine is planned to use a decline with a dip of 3 0 to access the ore body at a depth of 5 0

A mine is planned to use a decline with a dip of 30 to access the ore body at a depth
of 500 meters. Estimate the vertical and horizontal insitu stresses at 500 m depth,
assuming the average unit weight of rock 27kNm3, horizontal Young's modulus 75
GPa and Poisson's ratio 0.3.