Question: A MSW landfill is being designed to handle solid waste generated by Binford at a rate of 50 Mg/d. It is expected that the waste

A MSW landfill is being designed to handle solid waste generated by Binford at a rate of 50 Mg/d. It is expected that the waste will be delivered by compactor truck on a 5d/week basis. the density as spread is 122 kg/m^3. it will be spread in 0.50 m layers and compacted to 0.25m. assuming three such lifts per day and a daily cover of 0.15m, determine the following

a) annual volume of lanfill consumed in m^3, and

b) daily horizontal area covered by the solid waste, ignore soil volume between stacks.

Estimate the theoretical production of landfill gas (CH4 only) from the degradation of 20.3 kg of rapidly decomposable MSW. Assume the density of methane is 0.7177 kg/m^3.

Step by Step Solution

3.42 Rating (149 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Anslysis data A Given Solid waste generation rate 50mad 50X10 g... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (2 attachments)

PDF file Icon

635dba7e07614_178370.pdf

180 KBs PDF File

Word file Icon

635dba7e07614_178370.docx

120 KBs Word File

Students Have Also Explored These Related Algorithms Questions!