Question: A . Multiple Charpy tests should ideally be undertaken at each temperature for improved reliability. B . The ductile - to - brittle transition temperature

A. Multiple Charpy tests should ideally be undertaken at each temperature for improved reliability.
B. The ductile-to-brittle transition temperature (DBTT) for the normalised and tempered steel in this graph is somewhere between -50C and +30C.
C. This steel grade loses much of its toughness at temperatures below the DBTT.
D. The DBTT of steel usually changes with composition.
E. This steel grade has greater ductility at temperatures below the DBTT.
23. A wire 2.5m long has a cross-sectional area of 2.5mm2. It is hung vertically, and a 4.5kg mass is hung from it. By how much does the wire stretch elastically if Young's modulus for the material is 2.01011Pa?(acceleration due to gravity =9.8ms-2)
A.0.72mm
B.2.21mm
C.0.0221mm
D.0.221mm
E.0.072mm
24. What stress applied to a copper wire would produce the same elastic elongation as a 50C rise in temperature? [Data for Cu : thermal expansivity =16.610-6C-1; elastic modulus =124.1GPa ]
A.103MPa
B.166MPa
C.830MPa
D.6205MPa,
E.11222MPa
A . Multiple Charpy tests should ideally be

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!