Question: A ( n ) ? is partially defined in the NEC as operation of equipment in excess of normal, full - load rating, or of
is partially defined in the NEC as operation of equipment in excess of normal, fullload rating, or of a conductor in excess of rated ampacity that, when it persists for a sufficient length of time, would cause damage or dangerous overheating.
a ground fault
b overcurrent
c overload
d short circuit
Clear my choice
An is partially defined in the NEC as operation of equipment in excess of normal, fullload rating, or of a conductor in excess of rated ampacity that, when it persists for a sufficient length of time, would cause damage or dangerous overheating.
a ground fault
b overcurrent
c overload
d short circuitI
An is partially defined in the NEC as operation of equipment in excess of normal, fullload rating, or of a conductor in excess of rated ampacity that, when it persists for a sufficient length of time, would cause damage or dangerous overheating.
a ground fault
b overcurrent
c overload
d short circuit
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock